Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Thermal Baths in Bad Ems
Photo © David Matthiessen
Drawing © 4a
Drawing © 4a
Grundriss Erdgeschoss
Drawing © 4a

Emser Thermal Baths

 Back to Projects list
Location
Bad Ems, Germany
Year
2012

New construction of a thermal baths with river sauna.

One recurrent theme in the design of the baths are the river pebbles that can also be found along the banks of the Lahn. It appears in the shaping of the individual building structures, the swimming pools and in the façade openings. The element of pebbles is also of central importance in the mural designs of the interior. Moreover, the materials used in the baths also capture the characteristics of pebbles. The individual building structures are shaped with their volume like a variety of stones that are layered and overlap like pebbles on a river bank. Located at the centre is the bathing hall – spacious and generously constructed, this forms the largest element. The sauna wing leads off from the bathing hall towards the west. With their distinctive pebble-like shape, the two building structures which accommodate the dining area and the shop slip into the overall volume of the bathing hall. Particular eye-catcher are the pebble-shaped sections in the north façade. The asymmetrical apertures give the side of the structure facing toward the town centre a lively and cheerful appearance.

Client
Emser Therme GmbH

Construction management
4a Baumanagement GmbH

Construction period
06/2011 until 12/2012

Construction costs
approx. 17 million euros

Gross floor area
approx. 7500 m²

Gross cubic volume
approx. 35500 m³

Service phases
1 to 8

Project team
Swantje Hanussek, Martin Schweizer (project management), Christian Voermann

Other Projects by 4a Architekten

Evangelical Grammar School Bad Marienberg
Bad Marienberg, Germany
Wilhelm-Maybach-School
Stuttgart, Germany
Indoor swimming pool Schwabach
Schwabach, Germany
Solebad Bad Wimpfen
Bad Wimpfen, Germany
Hirschbach Aquatic Centre
Aalen, Germany